Floor plans of MI6 headquarters in London ‘temporarily lost’ by contractor

MI6The floor plans of the headquarters of MI6, Britain’s foreign-intelligence agency, were temporarily lost by a contractor, an incident that led to a temporary lockdown of the building and the termination of the contract, according to media reports. The alleged incident took place at 85 Albert Embankment, a distinctive-looking building that has served since 1994 as the headquarters of MI6 —known officially as the Secret Intelligence Service, or SIS. The imposing structure is located on the bank of the River Thames alongside Vauxhall Bridge in downtown London.

Up until a few weeks ago, sections of the building were reportedly being refurbished by Balfour Beatty, a multinational construction services company based in London. Balfour Beatty employs over 25,000 workers worldwide and is known as a major British government contractor. According to reports, the company produced several floor plans of the sections of the MI6 headquarters that it had been hired to refurbish. The floor plans were kept in a secure location inside the MI6 building, and were accessible only to cleared Balfour Beatty employees.

A few weeks ago, however, over 100 pages of floor plans went missing, according to the British tabloid The Sun, which first reported the story. The alleged incident prompted a lockdown of the building, said the paper, even though the missing papers were not technically classified. They did, however, contain sensitive information about the layout of the MI6 headquarters, including information about entry and exit points, security features, and other potentially sensitive details.

After a while, “many” of the missing documents were found inside the building, said The Sun. The BBC’s security correspondent Gordon Corera said later that “[m]ost, but not all, of the documents were recovered” inside the building. It was eventually determined that the papers had gone missing due to “carelessness, rather than any hostile activity”, said The Sun, and the Balfour Beatty workers were allowed to leave the building. However, the company has reportedly been removed from the project as a result of what The Sun described as a “shocking security gaffe”.

The Sun and the BBC reached out to Balfour Beatty for comment, but were told that the company could not comment on sensitive matters involving government projects. The British Foreign Office also said that it did not comment on matters involving intelligence.

Author: Joseph Fitsanakis | Date: 30 December 2019 | Permalink

2 Responses to Floor plans of MI6 headquarters in London ‘temporarily lost’ by contractor

  1. Peter Parkinson says:

    Secret Service must have a lot of offices worldwide, nothing is secret on this world apart for what is not written in ones head. I worked on a secret base in 1969 at Stornoway apart of skynet the Russians knew about but operational information is secret. How stop the leaks make everything public, I could have an office in my backyard with communications centre and a gun under my pillow but not at 72 years of age unless a war occurs then we will all be dead.

  2. robken says:

    So, MI6 didn’t retain a copy – wow! call in Bond….

We welcome informed comments and corrections. Comments attacking or deriding the author(s), instead of addressing the content of articles, will NOT be approved for publication.